Isomerization Project, Desulfurization Plant and Naphtha to Gasoline Process.
Electrical Installation, Testing, Pre-Commissioning Works:
Electrical Sub Station Equipment, UPS & DC System, Power & Control Cable, Power & Lighting, LV/ MV Distribution Boards, Transformers, Cable Trays & Accessories, Earthing & Lightning Material, Fire & Gas Detection System, Fire Alarm System, Termination & Splicing, Electrical Bulks.
Instruments works includes Installation, Grounding, Testing,Pre-Commissioning of following :
Level Gauges, , Level Transmitters
Temperature Transmitters , Temperature Element, Temperature Gauge
H2S Analyzer, Thermowell, SO2 Analyzer, Oxygen Analyzer, Density Analyzer, Hydrogen Analyzer, Chromatograph Analyzer, O2 Analyzer, Moisture Analyzer, Gas Detectors. Alarm
Pressure Gauge, Diff. Pressure Gauge , Pressure Transmitters, Diff. Pressure Transmitters
Control Valves, Self-Regulating Valves, ON / OFF Valves , Air Operated Valves, Pressure Relief Valves, Deluge Valves
Flow Indicator, Orifice Plates
Process Control Automation Installation:
DCS, PLCs, Communication Systems cabinets and communication network