Attock Refinery Ltd. EPC: Hyundai Engineering Company, Korea

Isomerization Project, Desulfurization Plant and Naphtha to Gasoline Process.

 

Electrical Installation, Testing, Pre-Commissioning Works:

Electrical Sub Station Equipment, UPS & DC System, Power & Control Cable, Power & Lighting, LV/ MV Distribution Boards, Transformers, Cable Trays & Accessories, Earthing & Lightning Material, Fire & Gas Detection System, Fire Alarm System, Termination & Splicing, Electrical Bulks.

 

Instruments works includes Installation, Grounding, Testing,Pre-Commissioning of following :

Level Gauges, , Level Transmitters

Temperature Transmitters , Temperature Element, Temperature Gauge

H2S Analyzer, Thermowell, SO2 Analyzer, Oxygen Analyzer,  Density Analyzer, Hydrogen Analyzer, Chromatograph Analyzer, O2 Analyzer, Moisture Analyzer, Gas Detectors. Alarm

Pressure Gauge, Diff. Pressure Gauge , Pressure Transmitters, Diff. Pressure Transmitters

Control Valves, Self-Regulating Valves, ON / OFF Valves , Air Operated Valves, Pressure Relief Valves, Deluge Valves

Flow Indicator, Orifice Plates

 

Process Control Automation Installation:
DCS, PLCs, Communication Systems cabinets and communication network